Leading Edge

For the technical discussion of aircraft airframe construction to include tips, techniques, questions, and recommendations.
Post Reply
Luvn737s
New Member
Posts: 2
Joined: Tue Apr 11, 2006 3:37 pm

Leading Edge

Post by Luvn737s »

In the Acro Sport 2 the leading edge of the ailerons consist of a full span half-round (sort of) at the nose of the ribs with the entire forward part of the aileron covered in 1/16" plywood. How do you make a piece 44" long and conforming to a sort of half-round profile? Should I make a template and slide it along the piece to check it's conformity?
Post Reply

Return to “Airframe Construction”